Milham Avenue over Interstate 5
Fair Condition57 years old100 vehicles/day
Location
| State | California |
| County | Kings |
| Location | 06-kin-005-19.05 |
| Carries | Milham Avenue |
| Crosses | Interstate 5 |
| Coordinates | 36.00861, -119.98946 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 460.0 ft (140.2 m) |
| Max Span | 168.0 ft (51.2 m) |
| Deck Width | 34.1 ft (10.4 m) |
| Deck Area | 1458.1 sq m |
| Main Spans | 3 |
| Year Built | 1969 |
Traffic
| Avg Daily Traffic | 100 (2004) |
| Truck Traffic | 20% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 45 0071 |