Jackson Avenue over Future Ca Highspeed Rail
Good Condition4 years old2,000 vehicles/day
Location
| State | California |
| County | Kings |
| Location | E Of State RTE 43 8 AVE |
| Carries | Jackson Avenue |
| Crosses | Future Ca Highspeed Rail |
| Coordinates | 36.25487, -119.59390 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 211.9 ft (64.6 m) |
| Max Span | 91.9 ft (28 m) |
| Deck Width | 35.1 ft (10.7 m) |
| Deck Area | 691.2 sq m |
| Main Spans | 3 |
| Year Built | 2022 |
Traffic
| Avg Daily Traffic | 2,000 (2022) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 48 months |
| Owner | Other State Agencies |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 45C0152 |