SH 146 over Fairmont Parkway
Fair Condition39 years old48,875 vehicles/day
Location
| State | Texas |
| County | Harris |
| Location | 2.50 Mi S Of SH 225 |
| Carries | SH 146 |
| Crosses | Fairmont Parkway |
| Coordinates | 29.65237, -95.02999 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 332.0 ft (101.2 m) |
| Max Span | 119.1 ft (36.3 m) |
| Deck Width | 101.7 ft (31 m) |
| Deck Area | 3137.2 sq m |
| Main Spans | 3 |
| Year Built | 1987 |
Traffic
| Avg Daily Traffic | 48,875 (2020) |
| Truck Traffic | 8% |
| Lanes On Bridge | 4 |
| Lanes Under Bridge | 9 |
Inspection & Ownership
| Last Inspection | November 2022 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 121020038905088 |