Fairmont PKWY EB over Uprr & Hcfcd Ditch
Good Condition20 years old28,600 vehicles/day
Location
| State | Texas |
| County | Harris |
| Location | 0.5 Mi W Of SH 146 |
| Carries | Fairmont PKWY EB |
| Crosses | Uprr & Hcfcd Ditch |
| Coordinates | 29.65194, -95.03913 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 6 — Scour calculated, stable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 1580.1 ft (481.6 m) |
| Max Span | 115.2 ft (35.1 m) |
| Deck Width | 48.2 ft (14.7 m) |
| Deck Area | 7079.5 sq m |
| Main Spans | 13 |
| Year Built | 2006 |
Traffic
| Avg Daily Traffic | 28,600 (2009) |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 823 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 121020AA0144009 |