Fairmont PKWY EB over Uprr & Hcfcd Ditch

Good Condition20 years old28,600 vehicles/day

Location

StateTexas
CountyHarris
Location0.5 Mi W Of SH 146
CarriesFairmont PKWY EB
CrossesUprr & Hcfcd Ditch
Coordinates29.65194, -95.03913

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure8 (Very Good)
Substructure7 (Good)
Channel/Waterway7 (Good)
Scour Critical6 — Scour calculated, stable

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length1580.1 ft (481.6 m)
Max Span115.2 ft (35.1 m)
Deck Width48.2 ft (14.7 m)
Deck Area7079.5 sq m
Main Spans13
Year Built2006

Traffic

Avg Daily Traffic28,600 (2009)
Lanes On Bridge2

Inspection & Ownership

Last Inspection823
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number121020AA0144009

Nearby Bridges