Anderson RD over Hcfcd Unit C145-00-00
Good Condition47 years old12,630 vehicles/day
Location
| State | Texas |
| County | Harris |
| Location | 0.80 Mi E Of S Post Oak |
| Carries | Anderson RD |
| Crosses | Hcfcd Unit C145-00-00 |
| Coordinates | 29.60602, -95.45103 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 52.2 ft (15.9 m) |
| Max Span | 49.9 ft (15.2 m) |
| Deck Width | 56.8 ft (17.3 m) |
| Deck Area | 275.1 sq m |
| Main Spans | 1 |
| Year Built | 1979 (reconstructed 2000) |
Traffic
| Avg Daily Traffic | 12,630 (2011) |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 923 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 121020B03057180 |