W Fuqua RD EB over Hcfcd Unit C145-00-00
Good Condition42 years old8,770 vehicles/day
Location
| State | Texas |
| County | Harris |
| Location | 0.90 Mi E Of S Post Oak |
| Carries | W Fuqua RD EB |
| Crosses | Hcfcd Unit C145-00-00 |
| Coordinates | 29.61329, -95.45109 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 49.9 ft (15.2 m) |
| Max Span | 47.9 ft (14.6 m) |
| Deck Width | 33.1 ft (10.1 m) |
| Deck Area | 153.5 sq m |
| Main Spans | 1 |
| Year Built | 1984 |
Traffic
| Avg Daily Traffic | 8,770 (2011) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 923 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 121020B25905005 |