El Camino Real EB over Hcfcd Ditch

Fair Condition41 years old4,885 vehicles/day

Location

StateTexas
CountyHarris
Location0.3 Mi SE Of Pineloch
CarriesEl Camino Real EB
CrossesHcfcd Ditch
Coordinates29.57314, -95.13742

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure8 (Very Good)
Substructure6 (Satisfactory)
Channel/Waterway5 (Fair)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialPrestressed Concrete
DesignSlab
Total Length71.9 ft (21.9 m)
Max Span35.1 ft (10.7 m)
Deck Width32.2 ft (9.8 m)
Deck Area214.6 sq m
Main Spans2
Year Built1985

Traffic

Avg Daily Traffic4,885 (2010)
Lanes On Bridge2

Inspection & Ownership

Last Inspection923
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number121020B21814001

Nearby Bridges