Pebbleshire DR over Hcfcd Ditch
Fair Condition48 years old2,570 vehicles/day
Location
| State | Texas |
| County | Harris |
| Location | 0.4 Mi W Of El Camino |
| Carries | Pebbleshire DR |
| Crosses | Hcfcd Ditch |
| Coordinates | 29.56794, -95.13943 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 5 (Fair) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 103.0 ft (31.4 m) |
| Max Span | 40.0 ft (12.2 m) |
| Deck Width | 39.4 ft (12 m) |
| Deck Area | 376.8 sq m |
| Main Spans | 3 |
| Year Built | 1978 |
Traffic
| Avg Daily Traffic | 2,570 (2009) |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2023 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 121020B50563545 |