Pebbleshire DR over Hcfcd Ditch

Fair Condition48 years old2,570 vehicles/day

Location

StateTexas
CountyHarris
Location0.4 Mi W Of El Camino
CarriesPebbleshire DR
CrossesHcfcd Ditch
Coordinates29.56794, -95.13943

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure5 (Fair)
Substructure7 (Good)
Channel/Waterway6 (Satisfactory)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialPrestressed Concrete
DesignBox Beam - Multiple
Total Length103.0 ft (31.4 m)
Max Span40.0 ft (12.2 m)
Deck Width39.4 ft (12 m)
Deck Area376.8 sq m
Main Spans3
Year Built1978

Traffic

Avg Daily Traffic2,570 (2009)
Lanes On Bridge2

Inspection & Ownership

Last InspectionOctober 2023
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number121020B50563545

Nearby Bridges