Wurzbach PKWY WB over US 281 & Salado CR
Good Condition11 years old25,236 vehicles/day
Location
| State | Texas |
| County | Bexar |
| Location | 0.70 Mi E Of West AVE |
| Carries | Wurzbach PKWY WB |
| Crosses | US 281 & Salado CR |
| Coordinates | 29.55503, -98.48709 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 1585.0 ft (483.1 m) |
| Max Span | 155.8 ft (47.5 m) |
| Deck Width | 34.1 ft (10.4 m) |
| Deck Area | 5024.2 sq m |
| Main Spans | 1 |
| Year Built | 2015 |
Traffic
| Avg Daily Traffic | 25,236 (2023) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 16 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 150150025304254 |