Wurzbach Pky EB over Tool Yard RD

Good Condition27 years old18,615 vehicles/day

Location

StateTexas
CountyBexar
Location0.71 Mi E Perrin Beitel
CarriesWurzbach Pky EB
CrossesTool Yard RD
Coordinates29.53487, -98.39978

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length108.9 ft (33.2 m)
Max Span108.9 ft (33.2 m)
Deck Width55.8 ft (17 m)
Deck Area564.4 sq m
Main Spans1
Year Built1999

Traffic

Avg Daily Traffic18,615 (2023)
Truck Traffic1%
Lanes On Bridge3
Lanes Under Bridge2

Inspection & Ownership

Last Inspection523
Inspection FrequencyEvery 48 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number150150B38105019

Nearby Bridges