Wurzbach EB Off-rp over Salado Creek
Good Condition11 years old43,472 vehicles/day
Location
| State | Texas |
| County | Bexar |
| Location | 0.78 Mi E Of US 281 |
| Carries | Wurzbach EB Off-rp |
| Crosses | Salado Creek |
| Coordinates | 29.54941, -98.47435 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 725.4 ft (221.1 m) |
| Max Span | 126.6 ft (38.6 m) |
| Deck Width | 39.4 ft (12 m) |
| Deck Area | 2653.2 sq m |
| Main Spans | 6 |
| Year Built | 2015 |
Traffic
| Avg Daily Traffic | 43,472 (2023) |
| Truck Traffic | 1% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 523 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 150150B38105057 |