E&w2-n5 Connector over Gilroy Street
Good Condition65 years old12,600 vehicles/day
Location
| State | California |
| County | Los Angeles |
| Location | 07-la-002-15.30-la |
| Carries | E&w2-n5 Connector |
| Crosses | Gilroy Street |
| Coordinates | 34.10501, -118.25296 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete |
| Design | Box Beam - Multiple |
| Total Length | 51.8 ft (15.8 m) |
| Max Span | 50.9 ft (15.5 m) |
| Deck Width | 46.3 ft (14.1 m) |
| Deck Area | 222.8 sq m |
| Main Spans | 1 |
| Year Built | 1961 |
Traffic
| Avg Daily Traffic | 12,600 (2019) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 325 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 53 0164H |