E Eighth ST over Cedar Creek
Fair Condition23 years old6,630 vehicles/day
Location
| State | Texas |
| County | Dallas |
| Location | 0.20 Mi E Of SH 342 |
| Carries | E Eighth ST |
| Crosses | Cedar Creek |
| Coordinates | 32.74771, -96.79594 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 180.1 ft (54.9 m) |
| Max Span | 60.0 ft (18.3 m) |
| Deck Width | 56.1 ft (17.1 m) |
| Deck Area | 938.8 sq m |
| Main Spans | 3 |
| Year Built | 2003 |
Traffic
| Avg Daily Traffic | 6,630 (2022) |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 523 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 1805709E2720002 |