IH 30 EB over FM 560

Good Condition61 years old16,957 vehicles/day

Location

StateTexas
CountyBowie
Location2.75 Mi E Of Spur 86
CarriesIH 30 EB
CrossesFM 560
Coordinates33.47446, -94.28928

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialConcrete Continuous
DesignSlab
Total Length113.8 ft (34.7 m)
Max Span44.9 ft (13.7 m)
Deck Width41.7 ft (12.7 m)
Deck Area440.7 sq m
Main Spans3
Year Built1965

Traffic

Avg Daily Traffic16,957 (2022)
Truck Traffic8%
Lanes On Bridge2
Lanes Under Bridge2

Inspection & Ownership

Last Inspection724
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is possibly eligible (requires evaluation)
Structure Number190190061006101

Nearby Bridges