US 77 NB over FM 801 (ed Carey Dr)
Fair Condition21 years old39,120 vehicles/day
Location
| State | Texas |
| County | Cameron |
| Location | 1.50 Mi NW Of FM 509 |
| Carries | US 77 NB |
| Crosses | FM 801 (ed Carey Dr) |
| Coordinates | 26.16051, -97.68180 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 236.9 ft (72.2 m) |
| Max Span | 117.1 ft (35.7 m) |
| Deck Width | 59.1 ft (18 m) |
| Deck Area | 1299.6 sq m |
| Main Spans | 1 |
| Year Built | 2005 |
Traffic
| Avg Daily Traffic | 39,120 (2011) |
| Truck Traffic | 7% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 8 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 210310003907328 |