Sr-186 Foothill DR over I-80 (sr-80) Ebl And WB
Poor Condition60 years old18,995 vehicles/day
Location
| State | Utah |
| County | Salt Lake |
| Location | Mouth Of Parleys Canyon |
| Carries | Sr-186 Foothill DR |
| Crosses | I-80 (sr-80) Ebl And WB |
| Coordinates | 40.71456, -111.80724 |
Condition Ratings
| Overall Condition | Poor |
| Deck | 3 (Serious) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 5 (Fair) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 321.9 ft (98.1 m) |
| Max Span | 93.2 ft (28.4 m) |
| Deck Width | 81.0 ft (24.7 m) |
| Deck Area | 2423.1 sq m |
| Main Spans | 4 |
| Year Built | 1966 (reconstructed 2000) |
Traffic
| Avg Daily Traffic | 18,995 (2012) |
| Truck Traffic | 7% |
| Lanes On Bridge | 5 |
| Lanes Under Bridge | 5 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 0C 422 |