Sr-186 Sbl. over I-215 (sr-215) EB And WB
Fair Condition59 years old18,995 vehicles/day
Location
| State | Utah |
| County | Salt Lake |
| Location | Parleys Interchange |
| Carries | Sr-186 Sbl. |
| Crosses | I-215 (sr-215) EB And WB |
| Coordinates | 40.71226, -111.80499 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 355.6 ft (108.4 m) |
| Max Span | 100.1 ft (30.5 m) |
| Deck Width | 36.4 ft (11.1 m) |
| Deck Area | 1203.2 sq m |
| Main Spans | 4 |
| Year Built | 1967 (reconstructed 2017) |
Traffic
| Avg Daily Traffic | 18,995 (2012) |
| Truck Traffic | 7% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 3C 423 |