County Road over I-80 (sr-80) Ebl & Wbl
Fair Condition59 years old2,000 vehicles/day
Location
| State | Utah |
| County | Summit |
| Location | 6.6 Mi.northeast Wanship |
| Carries | County Road |
| Crosses | I-80 (sr-80) Ebl & Wbl |
| Coordinates | 40.89718, -111.39518 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 299.9 ft (91.4 m) |
| Max Span | 75.1 ft (22.9 m) |
| Deck Width | 29.9 ft (9.1 m) |
| Deck Area | 831.7 sq m |
| Main Spans | 5 |
| Year Built | 1967 (reconstructed 2015) |
Traffic
| Avg Daily Traffic | 2,000 (2012) |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 0C 434 |