Sr-280 over I-80 (sr-80) Ebl And Wbl

Fair Condition59 years old3,525 vehicles/day

Location

StateUtah
CountySummit
LocationCoalville Interchange
CarriesSr-280
CrossesI-80 (sr-80) Ebl And Wbl
Coordinates40.91237, -111.40289

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure6 (Satisfactory)
Substructure5 (Fair)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length201.1 ft (61.3 m)
Max Span72.5 ft (22.1 m)
Deck Width35.8 ft (10.9 m)
Deck Area668.2 sq m
Main Spans4
Year Built1967

Traffic

Avg Daily Traffic3,525 (2014)
Truck Traffic44%
Lanes On Bridge2
Lanes Under Bridge4

Inspection & Ownership

Last Inspection824
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number0F 113

Nearby Bridges