Sr-30 over Bear River
Fair Condition51 years old6,330 vehicles/day
Location
| State | Utah |
| County | Box Elder |
| Location | 2 Miles East Of Riverside |
| Carries | Sr-30 |
| Crosses | Bear River |
| Coordinates | 41.78432, -112.11235 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 5 (Fair) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 410.1 ft (125 m) |
| Max Span | 102.4 ft (31.2 m) |
| Deck Width | 40.0 ft (12.2 m) |
| Deck Area | 1,525 sq m |
| Main Spans | 4 |
| Year Built | 1975 |
Traffic
| Avg Daily Traffic | 6,330 (2014) |
| Truck Traffic | 29% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 423 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 0F 322 |