Sr-81 over Corinne Canal

Fair Condition43 years old840 vehicles/day

Location

StateUtah
CountyBox Elder
LocationSouth Of Fielding
CarriesSr-81
CrossesCorinne Canal
Coordinates41.79389, -112.11583

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure5 (Fair)
Substructure6 (Satisfactory)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignBox Beam - Multiple
Total Length71.9 ft (21.9 m)
Max Span65.9 ft (20.1 m)
Deck Width44.0 ft (13.4 m)
Deck Area293.5 sq m
Main Spans1
Year Built1983

Traffic

Avg Daily Traffic840 (2022)
Truck Traffic25%
Lanes On Bridge2

Inspection & Ownership

Last Inspection423
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number0F 509

Nearby Bridges