Us-89nb Off-ramp over Nb.frontage Road

Fair Condition22 years old3,534 vehicles/day

Location

StateUtah
CountyDavis
LocationCherry Hills Intchg.
CarriesUs-89nb Off-ramp
CrossesNb.frontage Road
Coordinates41.00889, -111.91139

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure7 (Good)
Substructure6 (Satisfactory)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignStringer/Multi-beam
Total Length321.2 ft (97.9 m)
Max Span157.5 ft (48 m)
Deck Width47.6 ft (14.5 m)
Deck Area1419.5 sq m
Main Spans2
Year Built2004

Traffic

Avg Daily Traffic3,534 (2022)
Truck Traffic18%
Lanes On Bridge2
Lanes Under Bridge1

Inspection & Ownership

Last Inspection623
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number1F 692

Nearby Bridges