I-80 (sr-80) Ebl over Co. Rd. Intchg. X-road
Fair Condition55 years old53,725 vehicles/day
Location
| State | Utah |
| County | Summit |
| Location | Jeremy Ranch Intchg. |
| Carries | I-80 (sr-80) Ebl |
| Crosses | Co. Rd. Intchg. X-road |
| Coordinates | 40.75336, -111.57193 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 189.3 ft (57.7 m) |
| Max Span | 69.9 ft (21.3 m) |
| Deck Width | 60.4 ft (18.4 m) |
| Deck Area | 1061.7 sq m |
| Main Spans | 3 |
| Year Built | 1971 |
Traffic
| Avg Daily Traffic | 53,725 (2014) |
| Truck Traffic | 33% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 2F 86 |