Us-40 Wb. Ramp over I-80 (sr-80) Ebl

Fair Condition25 years old28,140 vehicles/day

Location

StateUtah
CountySummit
LocationSilver Creek Jct. Intchg.
CarriesUs-40 Wb. Ramp
CrossesI-80 (sr-80) Ebl
Coordinates40.73043, -111.49804

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length748.0 ft (228 m)
Max Span247.0 ft (75.3 m)
Deck Width42.0 ft (12.8 m)
Deck Area2918.4 sq m
Main Spans4
Year Built2001

Traffic

Avg Daily Traffic28,140 (2014)
Truck Traffic27%
Lanes On Bridge2
Lanes Under Bridge3

Inspection & Ownership

Last Inspection824
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number4C 898

Nearby Bridges