I-70 (sr-70) Ebl over Co.rd. Int. X-road
Fair Condition53 years old3,870 vehicles/day
Location
| State | Utah |
| County | Emery |
| Location | Sinbad Interchange |
| Carries | I-70 (sr-70) Ebl |
| Crosses | Co.rd. Int. X-road |
| Coordinates | 38.88086, -110.65883 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 90.6 ft (27.6 m) |
| Max Span | 86.9 ft (26.5 m) |
| Deck Width | 49.9 ft (15.2 m) |
| Deck Area | 419.5 sq m |
| Main Spans | 1 |
| Year Built | 1973 |
Traffic
| Avg Daily Traffic | 3,870 (2014) |
| Truck Traffic | 45% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 924 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 2F 240 |