I-70 (sr-70) Wbl over Co.rd. Int. X-road
Fair Condition37 years old3,870 vehicles/day
Location
| State | Utah |
| County | Emery |
| Location | Sinbad Interchange |
| Carries | I-70 (sr-70) Wbl |
| Crosses | Co.rd. Int. X-road |
| Coordinates | 38.88100, -110.65870 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 82.3 ft (25.1 m) |
| Max Span | 80.1 ft (24.4 m) |
| Deck Width | 45.3 ft (13.8 m) |
| Deck Area | 346.4 sq m |
| Main Spans | 1 |
| Year Built | 1989 |
Traffic
| Avg Daily Traffic | 3,870 (2014) |
| Truck Traffic | 45% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 924 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 4F 240 |