I-80 (sr-80) Ebl over Rr. Trail @ Atkinson Cy.

Good Condition14 years old14,445 vehicles/day

Location

StateUtah
CountySummit
Location1.4 Mi.e.silver Creek Int
CarriesI-80 (sr-80) Ebl
CrossesRr. Trail @ Atkinson Cy.
Coordinates40.74221, -111.47492

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure8 (Very Good)
Substructure7 (Good)
Channel/Waterway9 (Excellent)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length152.9 ft (46.6 m)
Max Span149.0 ft (45.4 m)
Deck Width44.9 ft (13.7 m)
Deck Area638.4 sq m
Main Spans1
Year Built2012

Traffic

Avg Daily Traffic14,445 (2014)
Truck Traffic42%
Lanes On Bridge2

Inspection & Ownership

Last Inspection824
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number2F 801

Nearby Bridges