Us-40 (sr-40)wbl over Sr-248 Intchg. X-rd
Fair Condition37 years old22,560 vehicles/day
Location
| State | Utah |
| County | Summit |
| Location | East Park City Interchg. |
| Carries | Us-40 (sr-40)wbl |
| Crosses | Sr-248 Intchg. X-rd |
| Coordinates | 40.68291, -111.46205 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 207.3 ft (63.2 m) |
| Max Span | 145.0 ft (44.2 m) |
| Deck Width | 44.3 ft (13.5 m) |
| Deck Area | 853.2 sq m |
| Main Spans | 3 |
| Year Built | 1989 (reconstructed 2016) |
Traffic
| Avg Daily Traffic | 22,560 (2014) |
| Truck Traffic | 22% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 5 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 4C 754 |