Us-40 (sr-40) Wbl over Silver Creek & Abd.r

Fair Condition37 years old22,560 vehicles/day

Location

StateUtah
CountySummit
Location.4 Mi.se.park City Intchg
CarriesUs-40 (sr-40) Wbl
CrossesSilver Creek & Abd.r
Coordinates40.67718, -111.46090

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignStringer/Multi-beam
Total Length238.5 ft (72.7 m)
Max Span118.1 ft (36 m)
Deck Width44.3 ft (13.5 m)
Deck Area981.5 sq m
Main Spans3
Year Built1989

Traffic

Avg Daily Traffic22,560 (2014)
Truck Traffic22%
Lanes On Bridge2

Inspection & Ownership

Last Inspection824
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number4F 463

Nearby Bridges