E10 Busway - N710 over Dorchester Drain

Good Condition52 years old500 vehicles/day

Location

StateCalifornia
CountyLos Angeles
Location07-la-010s-21.45-monp
CarriesE10 Busway - N710
CrossesDorchester Drain
Coordinates34.06215, -118.16352

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway5 (Fair)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialConcrete Continuous
DesignBox Beam - Multiple
Total Length443.6 ft (135.2 m)
Max Span92.8 ft (28.3 m)
Deck Width27.9 ft (8.5 m)
Deck Area1149.2 sq m
Main Spans6
Year Built1974

Traffic

Avg Daily Traffic500 (2015)
Lanes On Bridge1

Inspection & Ownership

Last Inspection523
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number53 2542G

Nearby Bridges