SR 118 EB over Bull Creek Canyon Chan
Good Condition32 years old254,000 vehicles/day
Location
| State | California |
| County | Los Angeles |
| Location | 07-la-118-r8.84-la |
| Carries | SR 118 EB |
| Crosses | Bull Creek Canyon Chan |
| Coordinates | 34.26965, -118.48758 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 321.9 ft (98.1 m) |
| Max Span | 128.9 ft (39.3 m) |
| Deck Width | 117.5 ft (35.8 m) |
| Deck Area | 3512.0 sq m |
| Main Spans | 3 |
| Year Built | 1994 |
Traffic
| Avg Daily Traffic | 254,000 (2020) |
| Lanes On Bridge | 7 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 53 2794R |