Garey AVE over Thompson Crk

Fair Condition61 years old16,100 vehicles/day

Location

StateCalifornia
CountyLos Angeles
Location0.3mi N/o Foothill BLVD
CarriesGarey AVE
CrossesThompson Crk
Coordinates34.11095, -117.74843

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure5 (Fair)
Substructure7 (Good)
Channel/Waterway9 (Excellent)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignSlab
Total Length144.4 ft (44 m)
Max Span33.1 ft (10.1 m)
Deck Width141.1 ft (43 m)
Deck Area1,892 sq m
Main Spans1
Year Built1965

Traffic

Avg Daily Traffic16,100 (2017)
Truck Traffic1%
Lanes On Bridge2

Inspection & Ownership

Last InspectionOctober 2023
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number53C0505

Nearby Bridges