Santa Anita AVE over Rio Hondo
Poor Condition67 years old32,849 vehicles/day
Location
| State | California |
| County | Los Angeles |
| Location | 0.8mi W/o Peck RD |
| Carries | Santa Anita AVE |
| Crosses | Rio Hondo |
| Coordinates | 34.09504, -118.02760 |
Condition Ratings
| Overall Condition | Poor |
| Deck | 4 (Poor) |
| Superstructure | 5 (Fair) |
| Substructure | 7 (Good) |
| Channel/Waterway | 9 (Excellent) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 176.8 ft (53.9 m) |
| Max Span | 57.1 ft (17.4 m) |
| Deck Width | 64.0 ft (19.5 m) |
| Deck Area | 1051.0 sq m |
| Main Spans | 3 |
| Year Built | 1959 |
Traffic
| Avg Daily Traffic | 32,849 (2017) |
| Truck Traffic | 2% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 53C0648 |