Victory BLVD over Tujunga Wash
Good Condition74 years old38,000 vehicles/day
Location
| State | California |
| County | Los Angeles |
| Location | Btw Morse Av & Ethel Av |
| Carries | Victory BLVD |
| Crosses | Tujunga Wash |
| Coordinates | 34.18656, -118.41768 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Box Beam - Multiple |
| Total Length | 87.9 ft (26.8 m) |
| Max Span | 80.1 ft (24.4 m) |
| Deck Width | 95.5 ft (29.1 m) |
| Deck Area | 779.9 sq m |
| Main Spans | 1 |
| Year Built | 1952 (reconstructed 1986) |
Traffic
| Avg Daily Traffic | 38,000 (2020) |
| Truck Traffic | 4% |
| Lanes On Bridge | 6 |
Inspection & Ownership
| Last Inspection | 924 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 53C1370 |