Western Avenue over 212th Street Drain
Fair Condition67 years old39,320 vehicles/day
Location
| State | California |
| County | Los Angeles |
| Location | 212th Street |
| Carries | Western Avenue |
| Crosses | 212th Street Drain |
| Coordinates | 33.83719, -118.30883 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 8 (Very Good) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Culvert |
| Total Length | 35.1 ft (10.7 m) |
| Max Span | 16.1 ft (4.9 m) |
| Deck Area | 211.9 sq m |
| Main Spans | 2 |
| Year Built | 1959 |
Traffic
| Avg Daily Traffic | 39,320 (2020) |
| Truck Traffic | 3% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 53C1382 |