Harvest AVE over Gridley Drn
Fair Condition62 years old28,629 vehicles/day
Location
| State | California |
| County | Los Angeles |
| Location | 0.2mi E/o Studebaker RD |
| Carries | Harvest AVE |
| Crosses | Gridley Drn |
| Coordinates | 33.84324, -118.09168 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 8 (Very Good) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 48.6 ft (14.8 m) |
| Max Span | 24.3 ft (7.4 m) |
| Deck Width | 46.9 ft (14.3 m) |
| Deck Area | 211.6 sq m |
| Main Spans | 2 |
| Year Built | 1964 |
Traffic
| Avg Daily Traffic | 28,629 (2015) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 125 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 53C1484 |