Cherry AVE over Dominguez Chan
Good Condition66 years old4,141 vehicles/day
Location
| State | California |
| County | Los Angeles |
| Location | 200ft W/o Crenshaw BLVD |
| Carries | Cherry AVE |
| Crosses | Dominguez Chan |
| Coordinates | 33.87975, -118.32694 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 9 (Excellent) |
| Culvert | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 86.0 ft (26.2 m) |
| Max Span | 24.9 ft (7.6 m) |
| Deck Width | 43.0 ft (13.1 m) |
| Deck Area | 343.2 sq m |
| Main Spans | 3 |
| Year Built | 1960 |
Traffic
| Avg Daily Traffic | 4,141 (2012) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 821 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 53C1561 |