Windsor Way over Queen Mary Prk Lot Exit
Fair Condition57 years old14,280 vehicles/day
Location
| State | California |
| County | Los Angeles |
| Location | 0.3mi S/o Harbor Plz |
| Carries | Windsor Way |
| Crosses | Queen Mary Prk Lot Exit |
| Coordinates | 33.74959, -118.19086 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete |
| Design | Frame |
| Total Length | 38.4 ft (11.7 m) |
| Max Span | 19.4 ft (5.9 m) |
| Deck Width | 120.1 ft (36.6 m) |
| Deck Area | 428.2 sq m |
| Main Spans | 2 |
| Year Built | 1969 |
Traffic
| Avg Daily Traffic | 14,280 (2014) |
| Truck Traffic | 2% |
| Lanes On Bridge | 3 |
Inspection & Ownership
| Last Inspection | November 2024 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 53C1592 |