Fremont AVE over Uprr
Poor Condition47 years old51,262 vehicles/day
Location
| State | California |
| County | Los Angeles |
| Location | 50ft S/o Mission RD |
| Carries | Fremont AVE |
| Crosses | Uprr |
| Coordinates | 34.07905, -118.15178 |
Condition Ratings
| Overall Condition | Poor |
| Deck | 4 (Poor) |
| Superstructure | 4 (Poor) |
| Substructure | 5 (Fair) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Slab |
| Total Length | 53.1 ft (16.2 m) |
| Max Span | 47.9 ft (14.6 m) |
| Deck Width | 84.0 ft (25.6 m) |
| Deck Area | 414.7 sq m |
| Main Spans | 1 |
| Year Built | 1979 |
Traffic
| Avg Daily Traffic | 51,262 (2017) |
| Truck Traffic | 3% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | 723 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 53C1674 |