State Street over Metrolink & Busway

Good Condition101 years old19,272 vehicles/day

Location

StateCalifornia
CountyLos Angeles
LocationBtw Mcallister/pomeroy Av
CarriesState Street
CrossesMetrolink & Busway
Coordinates34.05594, -118.21129

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialConcrete Continuous
DesignTee Beam
Total Length133.9 ft (40.8 m)
Max Span34.1 ft (10.4 m)
Deck Width55.1 ft (16.8 m)
Deck Area685.4 sq m
Main Spans4
Year Built1925

Traffic

Avg Daily Traffic19,272 (2016)
Truck Traffic2%
Lanes On Bridge4

Inspection & Ownership

Last Inspection323
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number53C1930

Nearby Bridges