Interstate 215 over Bnsf Ry & Metrolink
Fair Condition69 years old192,000 vehicles/day
Location
| State | California |
| County | San Bernardino |
| Location | 08-sbd-215-6.59-sbd |
| Carries | Interstate 215 |
| Crosses | Bnsf Ry & Metrolink |
| Coordinates | 34.09966, -117.30161 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Tee Beam |
| Total Length | 113.8 ft (34.7 m) |
| Max Span | 44.9 ft (13.7 m) |
| Deck Width | 193.9 ft (59.1 m) |
| Deck Area | 2050.8 sq m |
| Main Spans | 3 |
| Year Built | 1957 (reconstructed 2013) |
Traffic
| Avg Daily Traffic | 192,000 (2020) |
| Truck Traffic | 10% |
| Lanes On Bridge | 11 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 54 0489 |