Route 40 E Bound over Wonsan Ditch
Good Condition62 years old9,850 vehicles/day
Location
| State | California |
| County | San Bernardino |
| Location | 08-sbd-040-r3.81 |
| Carries | Route 40 E Bound |
| Crosses | Wonsan Ditch |
| Coordinates | 34.86673, -116.94795 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Tee Beam |
| Total Length | 44.9 ft (13.7 m) |
| Max Span | 43.0 ft (13.1 m) |
| Deck Width | 57.1 ft (17.4 m) |
| Deck Area | 238.4 sq m |
| Main Spans | 1 |
| Year Built | 1964 |
Traffic
| Avg Daily Traffic | 9,850 (2024) |
| Truck Traffic | 35% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 924 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 54 0660R |