Chino AVE over Cucamonga Creek Channel
Good Condition47 years old3,721 vehicles/day
Location
| State | California |
| County | San Bernardino |
| Location | 0.2 Mi W Archibald AVE |
| Carries | Chino AVE |
| Crosses | Cucamonga Creek Channel |
| Coordinates | 34.01185, -117.60306 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 9 (Excellent) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 108.6 ft (33.1 m) |
| Max Span | 86.9 ft (26.5 m) |
| Deck Width | 86.0 ft (26.2 m) |
| Deck Area | 867.2 sq m |
| Main Spans | 1 |
| Year Built | 1979 (reconstructed 2018) |
Traffic
| Avg Daily Traffic | 3,721 (2012) |
| Truck Traffic | 7% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 125 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 54C0529 |