Harvard AVE over San Diego Creek Channel
Fair Condition38 years old20,000 vehicles/day
Location
| State | California |
| County | Orange |
| Location | 100 S/o Barranca PKWY |
| Carries | Harvard AVE |
| Crosses | San Diego Creek Channel |
| Coordinates | 33.68796, -117.81881 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Channel/Waterway | 9 (Excellent) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 100.4 ft (30.6 m) |
| Max Span | 49.9 ft (15.2 m) |
| Deck Width | 101.0 ft (30.8 m) |
| Deck Area | 942.5 sq m |
| Main Spans | 2 |
| Year Built | 1988 |
Traffic
| Avg Daily Traffic | 20,000 (2018) |
| Truck Traffic | 7% |
| Lanes On Bridge | 6 |
Inspection & Ownership
| Last Inspection | 622 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 55C0567 |