Pl Cnty RD 90 over I-25
Fair Condition60 years old618 vehicles/day
Location
| State | Wyoming |
| County | Platte |
| Location | Wheatland - Glendo |
| Carries | Pl Cnty RD 90 |
| Crosses | I-25 |
| Coordinates | 42.08940, -104.98078 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Slab |
| Total Length | 230.0 ft (70.1 m) |
| Max Span | 69.9 ft (21.3 m) |
| Deck Width | 31.5 ft (9.6 m) |
| Deck Area | 673.0 sq m |
| Main Spans | 4 |
| Year Built | 1966 |
Traffic
| Avg Daily Traffic | 618 (2024) |
| Truck Traffic | 9% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 125 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | ADV |