I-25 Nbl over Fish Creek
Fair Condition60 years old3,743 vehicles/day
Location
| State | Wyoming |
| County | Platte |
| Location | Wheatland - Glendo |
| Carries | I-25 Nbl |
| Crosses | Fish Creek |
| Coordinates | 42.17911, -105.00205 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Tee Beam |
| Total Length | 145.7 ft (44.4 m) |
| Max Span | 58.1 ft (17.7 m) |
| Deck Width | 40.4 ft (12.3 m) |
| Deck Area | 546.1 sq m |
| Main Spans | 3 |
| Year Built | 1966 |
Traffic
| Avg Daily Traffic | 3,743 (2024) |
| Truck Traffic | 23% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 125 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | AEE |