I-80 Ebl over Piedmont Road
Fair Condition67 years old7,049 vehicles/day
Location
| State | Wyoming |
| County | Uinta |
| Location | Evanston - Green River |
| Carries | I-80 Ebl |
| Crosses | Piedmont Road |
| Coordinates | 41.29845, -110.62879 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Slab |
| Total Length | 80.4 ft (24.5 m) |
| Max Span | 29.9 ft (9.1 m) |
| Deck Width | 41.0 ft (12.5 m) |
| Deck Area | 306.2 sq m |
| Main Spans | 3 |
| Year Built | 1959 (reconstructed 1988) |
Traffic
| Avg Daily Traffic | 7,049 (2024) |
| Truck Traffic | 52% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | ANG |