I-80 Wbl over Leroy Road

Fair Condition67 years old7,342 vehicles/day

Location

StateWyoming
CountyUinta
LocationEvanston - Green River
CarriesI-80 Wbl
CrossesLeroy Road
Coordinates41.29858, -110.62878

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure5 (Fair)
Substructure6 (Satisfactory)
Scour CriticalNot applicable

Physical Characteristics

MaterialConcrete Continuous
DesignSlab
Total Length80.4 ft (24.5 m)
Max Span29.9 ft (9.1 m)
Deck Width41.0 ft (12.5 m)
Deck Area306.2 sq m
Main Spans3
Year Built1959 (reconstructed 1988)

Traffic

Avg Daily Traffic7,342 (2024)
Truck Traffic53%
Lanes On Bridge2
Lanes Under Bridge2

Inspection & Ownership

Last Inspection724
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure NumberANH

Nearby Bridges