US 26 over Wyo Central Canal No 2

Fair Condition69 years old13,777 vehicles/day

Location

StateWyoming
CountyFremont
LocationDiversion D Jt - Riverton
CarriesUS 26
CrossesWyo Central Canal No 2
Coordinates43.02464, -108.39439

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure6 (Satisfactory)
Substructure7 (Good)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignFrame
Total Length24.9 ft (7.6 m)
Max Span19.7 ft (6 m)
Deck Width86.9 ft (26.5 m)
Deck Area201.4 sq m
Main Spans1
Year Built1957

Traffic

Avg Daily Traffic13,777 (2024)
Truck Traffic1%
Lanes On Bridge5

Inspection & Ownership

Last InspectionNovember 2023
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure NumberBYX

Nearby Bridges