US 26 over Leclair Canal No 2
Fair Condition48 years old5,449 vehicles/day
Location
| State | Wyoming |
| County | Fremont |
| Location | Diversion D Jt - Riverton |
| Carries | US 26 |
| Crosses | Leclair Canal No 2 |
| Coordinates | 43.03372, -108.43790 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 55.1 ft (16.8 m) |
| Max Span | 53.1 ft (16.2 m) |
| Deck Width | 80.1 ft (24.4 m) |
| Deck Area | 409.9 sq m |
| Main Spans | 1 |
| Year Built | 1978 |
Traffic
| Avg Daily Traffic | 5,449 (2024) |
| Truck Traffic | 3% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | DJD |